The XT815-M is a cost-effective mechanical pulse prepaid water meter fully aligned with the IEC 62055 STS standard. It combines a mature mechanical metering structure with secure 20-digit TOKEN recharge, intelligent valve control and optional remote communication. The model is designed for residential properties, commercial buildings and large-scale retrofit projects that require dependable prepaid billing at a controlled project cost.
| Parameter | Specification |
| Model | XT815-M mechanical pulse type |
| Metering method | Mechanical impeller + pulse acquisition |
| Nominal diameter | DN15 / DN20 / DN25 |
| Permanent flow rate Q3 | DN15: 2.5 m³/h · DN20: 4.0 m³/h · DN25: 6.3 m³/h |
| Turndown ratio | R100 |
| Accuracy class | Class 2 |
| Water volume unit | 0.001 m³ |
| Static current | ≤ 20 μA |
| Temperature class | T30 |
| Rated water pressure | 1.6 MPa |
| Ingress protection | IP68 |
| Installation orientation | Horizontal (H) or vertical (V) |
| Power supply | Long-life lithium battery; typical service life 6–10 years |
| Communication options | 4G / LoRa / LoRaWAN |
| Prepayment protocol | STS (IEC 62055), 20-digit encrypted TOKEN |
Residential billing: Prepaid water management for apartments, communities and housing developments.
Bulk meter replacement: A practical solution for budget-sensitive utility retrofit and meter renewal programs.
Commercial properties: Credit-based water supply control for shops, offices, dormitories and rental properties.
Commissioning: Open the upstream valve slowly while venting through a downstream outlet. Confirm stable flow indication, normal accumulation and leak-free connections.
The customer enters a secure 20-digit STS TOKEN. Once accepted, the credit is added and the valve can reopen automatically after a valid recharge.
The meter can issue a low-balance warning and automatically close the motorized valve when the available credit reaches the configured limit.
Yes. Depending on the selected configuration, 4G, LoRa or LoRaWAN can be used for remote reading, parameter configuration and reporting.
Remove the nearby magnetic source first, then restore the valve using the authorized error-clearing TOKEN according to the project procedure.